The making of the Balaklava Bay infrastructure development concept
Going on location to study the situation.
Public areas are uncomfortable and depressing.
The devastation is especially evident against the backdrop of picturesque natural views.
Part of them are obscured by dense commercial construction along the shore.
The Metallist plant is also in a poor state. Most of the shops aren’t functioning, one of the main quays sank into the water, the crane is beyond repair.
Analyzing the geography of the bay along with the social, economic and city planning circumstances.
The bay’s convenient geographic location make it a perfect place for an upscale marina. Looking at examples from all over the world.
The existing quay and pier network is in need of serious renovation. Designing the marina.
Deciding on the location of the main infrastructure objects and starting to work on sketches.